Project Engineer:

Kardy Schucknecht

 

Project Name & No.

F9 3349; Yakima River Greenway 2009 Flood Repairs

Cost Per Plan:

$20.00

 

Engineerís Estimate:

$54,000

Bid Date & Time:

Wed., June 16, 2010 @ 2 pm

Date

Plan #

Name and Address

General

Or Sub

Phone Number

Fax Number

Method of Pay

E-Mail

 

1-13

In-house

 

 

 

 

 

6/3

14

Columbia Asphalt

P. O. Box 9337

Yakima, WA98909

General

509-453-2063

509-877-6963

Billed

melodee@columbiaasphalt.com

6/4

15

Pendleton Excavating & Paving

1614 E. Mead Ave.

Union Gap, WA98903

General

509-945-2638

509-576-6925

R834

 

6/7

16

Thayer Excavating LLC

2131 Riverbottom Road

Ellensburg, WA98926

General

509-925-5457

509-962-6813

Billed

 

kthayerx@gmail.com

 

6/4

17

Durandís Inc.

5260 SR 24

Moxee, WA98936

General

509-452-5457

509-457-9659

Billed

 

6/9

18

Granite Northwest

80 Pond Road

Yakima, WA98901

General

509-248-8376

509-576-7056

Billed

Linda.knight@gcinc.com