The design includes underdrains and sampling vaults to provide for collection of water quality samples from designed artificial storm events. After passing through the collection vaults, the stormwater enters an infiltration trench with a perforated pipe and infiltrates into the ground. The cost for construction was $127,700 and completed the summer of 2010.
View the Photo Gallery