Below you will find information that might help you understand how to find things or learn about information you might need to know about your city or town.
Yakima County does not have a speed bump installation program in place at this point in time. Yakima County does not install speed bumps, and will not until such a program is put in place. Some considerations that will go into such a program include:
Yakima County does not have an ordinance in place against ordinary (muffled) compression brake use, and therefore such signs are not installed along Yakima County roadways. Unmuffled compression brakes are already prohibited and penalized by state law, and additional signs are not needed for enforcement. Details of this are outlined in RCW 46.37.395. Some points in favor of compression brakes use:
Certainly, there are non-complying vehicles in terms of their noise levels. These non-complying brakes are loud and disruptive, but enforcement is very difficult, requiring direct observation by an officer and the ability to accurately discern whether or not they are in compliance. Often non-complying brakes are found on older farm trucks. WAC 173-62-060 specifies enforcement criteria and states the “Measurements shall be made with a sound level meter meeting Type 1, S1A, 2 or S2A requirements as specified in the American National Standards Specifications for Sound Level Meters S1.4-1971 as required under measurement procedures established in chapter 204-56 WAC, "procedures for measuring motor vehicle sound levels." WAC 204-56 was repealed circa 1997/1998. We believe this WAC was repealed because it presented rigorous methodology that was more appropriate in a controlled setting than actual field conditions, and we are unaware of any replacement WAC. So in order to enforce, Law Enforcement formerly needed special tools and training and effort. Currently, we are unaware of specifications for level and how to determine it other than reliance on the Federal regulation - CFR 205.54-1,2 - also very rigorous and specialized in terms of measurement. This is a difficult predicament for law enforcement for enforcement which is a significant contributor to why the county does not have an ordinance in place.
WSDOT South Central Region shares similar sentiments about compression brakes, and does not post signs prohibiting their use on state roads, excepting within city limits where they are prohibited, and even then WSDOT only posts these signs when requested by the local agency.
There is no standard process or petition form available for the adoption of a private road by Yakima County. Private Roads are only rarely accepted into the Public Road network.
Yakima County maintains a stance that, prior to being considered for adoption, a private road must already meet Yakima County standards. Specifically, a road must meet modern AASHTO Paved Road standards. Yakima County is reluctant to adopt substandard roadways into our already existing 500+ miles of gravel roads. Property owners can express their views during commissioner hearings, but the prerequisite for adoption will remain adherence to Yakima County standards. This approach is standard throughout many agencies, as the cost of paving a road to bring it up to modern standards is often over $1 million per mile, and road construction funds are finite.
Furthermore, even if a private road is built or improved to meet Yakima County Standards, there is no guarantee of adoption into the public road network. Meeting Yakima County standards is considered the bare minimum for consideration as a condition of recommendation. Yakima County's recommendation depends on many factors, including whether or not there would be a benefit granted to the public by adopting the roadway. The final determination to adopt a roadway or not is made by the Board of County Commissioners. We recommend you contact us at (509)574-2300 to discuss this further.
Yakima County maintains a list of all paved, public, non-incorporated roads where striping is done or maintained. This list is called the "longitudinal pavement marking list." In order for a road to be added to this list, it must meet the Yakima County Roads Policy established for Longitudinal Pavement Markings. You can read this policy here. You can contact the Traffic Engineering Department at (509)574-2300 if you believe that your road meets the criteria but is not currently striped.
Yakima County appreciates your concern for the safety and well-being of your neighborhood. Unfortunately, Yakima County has a limited budget for the installation of new street lights and other safety improvements, totaling $65,000 a year budgeted (as of 2024 6-year TIP). The cost of installing a new street light is considerable. The material cost for the steel light standard, luminaire arm, and light fixture alone is around $5000 (2024). Once the cost of establishing a new service connection and labor (electricians, traffic control, staff time) is factored in, the total cost for a new light ranges between $7,000 and $10,0000. Because the cost is so high, when it comes to new street lights, Yakima County prioritizes areas where there is a higher frequency of nighttime collisions. This ensures that Yakima County's resources are allocated to areas where they are able to have the most significant impact on public safety.
Additionally, while we understand that street lighting can enhance security, Yakima County's primary goal for new street light installations is to improve the safety for road users such cars, bicyclists, and pedestrians. Because our funds are limited, we do not typically install street lights solely for security purposes.
If you believe that your area warrants street lights, please do not hesitate to reach out to the Traffic Department at (509)574-2300 to discuss your neighborhood specifically.
Yakima County performs a semi-annual review of county road speed zones and traffic stops. Depending on changes in traffic flow, safety impacts, and other factors, changes will be presented to the County Commissioners through the public hearing process to approve/deny proposed changes.
Suggestions/requests for changes to speed zones or traffic stop signage may be sent to the attention of the Transportation Engineering Manager, Yakima County Public Services. For more information, please call 509-574-2300.
Yes. A permit is required for the movement of all the following, on Yakima County Roads:
Please review the Special Motor Vehicle Checklist for all requirements. To request a permit, please call Yakima County Public Services 509-574-2300.
Please submit the completed application to Keila Mendoza, fax 509-574-2301, direct line 509-574-2302
Current Yakima County development standards, road standards, codes, and ordinances can be found in Chapter 19.23 of Yakima County Ordinances and on the
If you find a signal light, luminaire, or other electrical traffic device inoperative, please contact the Traffic Engineering division at 509-574-2300.
Please have the available when you call:
This information helps our staff diagnose and repair the issues in a timely manner at the lowest cost to taxpayers so that Yakima County drivers, pedestrians, and cyclists are able to use our road systems optimally.